CYCLES ROUTES > LE CESROUTE DE 1997 à 2009 > CESROUTE 01-02 - PRESENTATION DES PROJETS PERSONNELS / PERSONAL PROJECTS PRESENTATION

JOURNAL-NEWS
 
CYCLES ROUTES
CYCLE ROUTES 09-10
CYCLE ROUTES 10-11
CYCLE ROUTES 2010
LE CESROUTE DE 1997 à 2009

METHODES / METHODS
A- ACTUALITES / NEWS
B- DEMARCHES / APPROACHES
C- PROCESSUS / PROCESS
D- REFERENCES
E- Formations en support de ces méthodologies
F- Les logiciels supports de ces méthodologies et processus

CYCLES INTERNATIONAUX / INTERNATIONAL SEMINARS
Česky
Arabia - عربية
Bahasa Malaysia
Balgarski
Deutsch
Eesti
English
Español
Français
Hanyu - 汉语
Italiano
Kokugo - 国語
Latviski
Lietuviskai
Magyar
Nederlands
Polski
Portugues
Româneste
Ruski - по русски
Slovensky

METRATECH
PARTENAIRES-PARTNERS
RESULTATS / RESULTS
TOURISME & VIE SOCIALE / TOURISM & SOCIAL LIFE

PUBLICATIONS
DOSSIERS PEDAGOGIQUES / PEDAGOGICAL FILES
PRESSES DE L’ENPC

SITE
Comment utiliser le site / How to use this site
Comment y participer / How to contribute

CESROUTE 01-02 - PRESENTATION DES PROJETS PERSONNELS / PERSONAL PROJECTS PRESENTATION
mercredi 2 octobre 2002 , Abakar Koroty Mahamat, Bouchra Bentaleb, Dorina Tiron, Jean-Olivier Laval, Karen Badalyan, Ludvik Engel, Magdalena Keska, Peeter Skepast, Zigmantas Perveneckas, Zoltan Takacs


La présentation des projets personnels s’est déroulée à l’Ecole nationale des ponts et chaussées : ENPC - 28 rue des Saints Pères - PARIS 7° - les 29 et 30 octobre 2002 / The presentation of the personal projects has been helded at Ecole nationale des ponts et chaussées : ENPC - 28 rue des saints Pères - Paris 7° - on october 29th & 30th

TELECHARGER LES PHOTOS
DOWNLOAD THE PICTURES

-  PRESENTATION

- EVALUATION ET CEREMONIE DE CLOTURE / ASSESSMENT MEETING AND OF THE CLOSING CEREMONY




PLANNING DE PRESENTATION DES PROJETS PERSONNELS / SCHEDULE OF PRESENTATION OF THE PERSONAL PROJECTS


OCTOBER 29th OCTOBRE :



- 9.30 to 11.00

image 94 x 125Mr. Karen BADALYAN - ARMENIE

ROAD SAFETY IMPROVEMENT - MANAGEMENT AND MONITORING

Contacts : MM. Lanet et Poirier (ISTED) & M. Mignard (Chargé du Bureau de la Sécurité et des Equipements)

La création d’un schéma de contrôle de sécurité routière applicable en Arménie



- 11.15 to 12.45

Mrs. Magdalena KESKA - POLOGNE

ISPA IN POLAND : PREPARATION FOR EXTENDED DECENTRALIZATION OF IMPLEMENTATION SYSTEM

Contacts : Mr Robin Sebille - responsable regional Europe de l`Est et Asie centrale in Ministere de l’transports et du Logement ( direction des Affaires economiques et internationales) ; Mr Francoise Henriot - Adjoint au Charge du bureau des operations autoroutieres in Ministere de l’transports et duLogement (Direction des Routes) ; Mr Jean-Claude Ebel - responsible for International Cooperation in DATAR

Proper ISPA projects management in the context of the "future"use of cohesion & structural funds

- improvement and speed up the process of implementation ofEU Projects ;
- supervision on preparation of Application forms
- improvement of cooperation with EC Delegation in Poland
- speed up tendering procedures

- 14.30 to 16.00

image 94 x 125Mr. Ludvik ENGEL - REP TCHEQUE

MANAGEMENT QUALITYY OF RECONSTRUCTION MOTORWAYS CONCRETE PAVEMENT

Contacts :
- Honore Goacolou - Direction des Technigues et de la Promotion - EUROVIA
- Samir Soliman - Eurovia central laboratrory of Eurovia form in Dourdan
- Mr Cochet - LREP ( Bourget) & Mr. Brusle - SETRA (Bagneux)

In first step of my presentation I want to tell something about French way of reconstruction. In second step I will choose one or two possibility of reconstruction, which I thing we are able to use in Czech Republic. And I will show the way how to reach a good level of quality. The system which I want to use we can call Money adjustment. If the quality is good, I will pay 100%. If less I Will pay less money, If the level quality is more than I set than I will pay more.



- 16.15 to 17.45

image 94 x 125Mr. Zigmantas PERVENECKAS - LITUANIE

BITUMINOUS MATERIALS FOR HEAVY DUTY PAVEMENTS. SOLUTIONS FOR LITHUANIAN ROADS

Contacts : Mr. Caroff - SCETAUROUTE (2001- 2nd semester)

- factors causing deformations in the pavement
- description of the distress mechanisms
- possible solutions to counteract distress
- test methods used to evaluate characteristics
- use of modified binders
- use of Stone Mastic Asphalt
- setting up of requirements and recommendations



- 18.00 to 19.30

image 91 x 125 M Abakar Koroty Mahamat - TCHAD

ETUDE DE FAISABILITE TECHNIQUE & ECONOMIQUE D’UNE LIAISON ROUTIERE AU TCHAD

cette présentation est programmée sous réserve de texte à parvenir / this presentation is scheduled depending of the text existing









OCTOBER 30th OCTOBRE :


9.30 to 11.00

image 94 x 125Mr Zoltan Takacs - HONGRIE

AN ANALYSIS OF THE HIERARCHICAL STRUCTURE AND DEVELOPMENT OF THE EXPRESSWAY AND HIGHWAY NETWORK

Contacts :M. Jean-Marc Sangouard - SETRA, M. Lionel Patte - SETRA, M. Claude Becker - SETRA

- Presenting an overview of the French system of making medium and long term developmental conceptions, plans
- Getting knowledge of different layouts of the main road network (focus on the expressways, which are not motorways)
- Using these informations and experiences in my work at home.


11.15 to 12.45

image 94 x 125M Peeter Skepast - ESTONIE

’EXPERIENCE ON BRIDGE, TUNNEL AND ROAD CONCESSIONS - SELECTED CASES’

Contacts : France
- Alain Fayard, General Inspector, Special Adviser to the Director, French Road Directorate
- Naïma Cobo, Adviser, Economic and European Affairs, French Road Directorate
- Alain Poliakoff, Business Development Director, Egis Projects
- Emmanuel Michaux, Business Development Manager, Egis Projects
- Yves Lajeunesse, Executive Vice President, International Activities, Cofiroute
- Erik Merkez, Project Engineer, Cofiroute
- Lauriane Chappé, Manager of the A 86 West Information Center, Cofiroute
- Pascal Lechanteur, Sous direction des autoroutes et des ouvrage concedes, French Road Directorate Elsewhere
- Estonian Embassy in Greece
- Estonian Embassy in Canada
- Estonian Embassy in Portugal
- Estonian Embassy in UK
- Finnish National Road Administration
- Public Road Administration of Iceland
- Icelandsbanki

Report contains description of the 5 concession cases in different countries. The projects are by nature fixed link type of projects, i.e. bridge or tunnel, but also one alone standing motorway stretch which does not form a wider network. Main value of the report is the collected data for each concession case, witch gives the overview and general picture of the project. In description of concession cases, it has been attempted to hold similar structure bearing in mind the possibility to compare the similar components in different projects.


14.30 to 16.00

image 94 x 125Ms Bouchra Bentaleb - MAROC

ELABORATION D’UN GUIDE METHODOLOGIQUE POUR L’EVALUATION DES AMENAGEMENTS DE SECURITE AU MAROC

Tuteurs : M Michel LABROUSSE SETRA - France & M Mohamed HIMMI DRCR - Maroc

- Analyse statistique de l’accidentologie au Maroc
- Programme des aménagements de sécurité au Maroc
- Pourquoi l’évaluation des aménagements de sécurité ?
- Présentation du guide et comment il se situe par rapport aux autres guides existants ou en cours d’élaboration
- Evaluation à priori
- Evaluations après mise en service : *Evaluation immédiatement après la mise en service *Evaluation 3 à 5 ans après la mise en service
- Mode opératoire du guide : *Processus d’élaboration des évaluations immédiatement après la mise en service *Processus d’élaboration des évaluations 3 à 5 ans après la mise en service
- Outils nécessaires pour la bonne exploitation du guide : * Fiches types d’aménagements * Fiches outils
- Etude de cas concrets choisis dans le 6ème projet routier au Maroc relatif aux aménagements de sécurité routière
- Conclusions
- Actions de management à mettre en œuvre dans la politique sécurité routière de la Direction des Routes au Maroc

16.15 to 17.45

image 91 x 125Ms Dorina Tiron - ROUMANIE

SYSTEME DE GESTION DU RESEAU ROUTIER

Tuteurs :M. Alain GHISOLI Directeur Etudes, Construction et Entretien des Routes - SETRA - FRANCE & M. Vasile BOBOC Professeur à la Faculté des ponts et Chaussées IASSY - ROUMANIE

- Création d’une base de données complète permettant l’archivage, la mise à jour et la production des documents de restitution ;

- L’évaluation pour optimiser les stratégies d’entretien à long terme, l’optimisation pourra concerner uniquement les coûts des travaux de construction d’entretien ou intégrer aussi le coût supporté par l’usager ; - Programmation des travaux ; L’évaluation et suivi du niveau de service

OCTOBER 31th OCTOBRE :


10.00 am to 12.00 am : M Guy POIRIER (ISTED) - M Jean-Olivier LAVAL (ENPC-PFE) & CESROUTE GROUP 2001-2002

- Bilan détaillé de la formation par rapport aux objectifs pédagogiques /Detailed assessment of the training regrading the pedagogical objectives
- Résultats concrets obtenus / Concrete results achieved
- Suites à donner / Action to be taken
- Structuration du réseau CESROUTE / Structuring the CESROUTE network


12.15 pm to 12.30 pm : M Philippe LEGER, M DEMARRE, M SCHMITT & CESROUTE Steering Comitee

Cérémonie de remise des certificats / Awarding Certificates Ceremony

12.30 pm : coktail de clôture


TELECHARGER LES PHOTOS DE LA PRESENTATION
DOWNLOAD THE PICTURESOF THE PRESENTATION


TELECHARGER LES PHOTOS DE L’EVALUATION ET DE LA CEREMONIE DE CLOTURE
DOWNLOAD THE PICTURES OF THE ASSESSMENT MEETING AND OF THE CLOSING CEREMONY

   


CESROUTE 01-02 - PP au 11/09/02
CESROUTE 2001-2002 / Projets Personnels - Personal Projects




Home | Contact | Site | Plan | Admin